Just got a letter from a client:
"The building inspector was out at the job today for electrical inspection he required us to remove all of the switch plates and outlet plates. During inspection he says any box with a 1/8” gap between it and the sheetrock has to be caulked. This will be every box. Is this some new code? I have never run into this even on jobs with blower door test we have not had to do this."
Anybody run into this?
thanks
RC
"The building inspector was out at the job today for electrical inspection he required us to remove all of the switch plates and outlet plates. During inspection he says any box with a 1/8” gap between it and the sheetrock has to be caulked. This will be every box. Is this some new code? I have never run into this even on jobs with blower door test we have not had to do this."
Anybody run into this?
thanks
RC