codewarrior321
Member
I have an oppurtunity to step in and only do the Installation Of Cameras In Traffic Control Poles And Some utility Poles. As it is specked out, I will Leave a UF cable whip for the Public Utility to Hook The Power To The Camera Control Module and the transceiver. My Question Is About the Grounding Of The Camera Equipment. Since the Power company is doing the Actual 120VAC Power Hook. I Was Wandering If any body has done this type of work and what did they do for the grounding of the equipment?
Thanks For Your Time.