RowE
Member
- Location
- Dumas Tx. 79029
I saw an install yesterday on a 4-wire 120/240v center tap delta. I?m not sure about the grounding of this type service. From the service disconnect to the house disconnect 200? away they ran five wires (3 ungrounded , a neutral, and an equipment grounding conductor). The neutral and the equipment grounding conductor where bonded at the service disconnect and at the house disconnect which was using the A&C phases 120v to ground . Wouldn?t this create a parallel path back to the service? Does the neutral and equipment grounding need to be unbonded or does it even need the fifth wire.