bure961
Senior Member
- Location
- Farmingham, MA
Prior to an AF study we made a couple of repairs to our cables that feed our old buildng , now we may need to replace the cable to this building. Will this change the results of the study as far as the information listed on the labels ? 3 PHASE 480 V 400A
Last edited: