I would like to use an existing 3" emt run for a project. The pipe is empty and I need to extend the run 40 feet. I do not have the cabibility to bend a off set or a kick in the 3 inch. I would like to use a 3" C condulet and reduce down to 1.5" coming out the other side. I do not have room for a pullbox if I use the 8X rule in sizing my box. Is this legal? And if it is legal what are your thoughts of doing it this way. It seems a little funky to me but I have no other options. Reruning the 1.5" is not a possibility. Thanks for your time. D