I agree!
Just take the time to go through the house double check your circuts. Some small tips, things that help me.
1. I will spraypaint lines in front of my boxes on the floor, that way when the drywallers go through, if they miss boxes, I know right where the are at, and it helps them too.
2. I lable the inside of my boxes where the wires come in with a sharpie. By the time you do several jobs, or by the time the other contractors come in, you forget exactly where everything was/is.
3. If you have any three way wiring, make sure its correct before the walls get sealed up.
4. Added cost, but its nice for future use. I usually run two, 1 1/2 conduit from utility room up wall to attic (1 for power wire, and 1 for communication) for future access in case basement gets finished, or owner wants additional items added after. (just cap both ends for fire code)
Good luck!
Why? What difference would it make? Do you not do make-up during rough? This seems like a total waste of time.
Create a system, and stick to it. Have one, maybe two ways of running 3-ways and that's it. Anything more can cause problems.
I agree!
Just take the time to go through the house double check your circuts. Some small tips, things that help me.
1. I will spraypaint lines in front of my boxes on the floor, that way when the drywallers go through, if they miss boxes, I know right where the are at, and it helps them too.
2. I lable the inside of my boxes where the wires come in with a sharpie. By the time you do several jobs, or by the time the other contractors come in, you forget exactly where everything was/is.
3. If you have any three way wiring, make sure its correct before the walls get sealed up.
4. Added cost, but its nice for future use. I usually run two, 1 1/2 conduit from utility room up wall to attic (1 for power wire, and 1 for communication) for future access in case basement gets finished, or owner wants additional items added after. (just cap both ends for fire code)
Good luck!
Why? What difference would it make? Do you not do make-up during rough? This seems like a total waste of time.
Just in multigang boxes. Avoids confusion if my other guys go back to wire up switchs.
Create a system, and stick to it. Have one, maybe two ways of running 3-ways and that's it. Anything more can cause problems.
This was just advise for getting started. I know i messed a few up in my early on days.
Trying to figure out this multi quoting option........ugh.
Just in multigang boxes. Avoids confusion if my other guys go back to wire up switchs............