Chiller Demand

Status
Not open for further replies.

mimo

Member
I have a building will be servied with:
4 chillers 42kw ea
2 secondary water pumps @ 10HP ea
2 chilled water pump @ 20HP ea
2 water heater @ 50kw ea
what will be the demand factor that will apply to these Loads..where I can find that in the code
Thanks everybody
 
Who sized these chillers, and by what method were they sized? Are they for comfort cooling or process cooling? They conceivably could run 24/7, you see.
 