I have been asked to bid on a remodel of the Office area of a Church/Education building. A wall is being removed and a new one added at a different part of the same room. The Office walls are of a block type so I will have to run a surface mounted something and the ceilings are rocked with 12x12 ceiling tiles locked into place. I would prefer to use WireMold which leads to my question.
What would be a good method of transitioning from MC to WireMold or would you run 1/2" flex(Greenfield) and pull it all in?
What would be a good method of transitioning from MC to WireMold or would you run 1/2" flex(Greenfield) and pull it all in?