MGE
Member
- Location
- San Diego Cal.
Mech Contractor has installed open/close indicating devices Class 1 Div 1,2 with a label that says a seal-off is required within 18". This device is installed in a Class 1 Div 2 area with a 4-20ma signal across the contacts for status only. Do I need a seal-off? Multiple devices installed at facility with NO seal-offs installed, what am I missing? Thanks MGE