We are running underground conduit in a classified methane area. When we leave a building underground , the conduit runs through a C1D1 zone. The run travels about 600' to the service entrance gear. There are 4 underground pull boxes and multiple couplings in the run. Am I required to place a seal off fitting at both ends of this run?