prosys
Member
- Location
- Webb City, MO, USA
I have multiple enclosures in series with one purge unit in a class 1 division 1 area. My question is this, can I connect the enclosures to each other with Type EF Liquid Tight? The liquid tight serves as my raceway and air path, plus I need the flexibility of the liquid tight. NFPA 496 does not state clearly the requirements for connecting purged enclosure in series. Can somebody over some advice on this subject??