I have a diesel fuel tank that needs power ran to it. The fuel tank is above ground and is located on the end of 200'x 80' steel building. The fuel company placed the tank 8'-9' away from the 480 volt 200 amp disconect installed on the building. The conduit system is going to go down the side of the building and underground over to the tank's pump using the appropriate seal offs and the E-stop.
My question is how far away does the edge of the tank need to be from the disconnect? Also how far off the building does the tank need to be?
My question is how far away does the edge of the tank need to be from the disconnect? Also how far off the building does the tank need to be?