2008 NEC Section 300.5 defines underground conduit as a wet location. Section 725 states that only parts of section 300 that are specifically mentioned apply. There is no reference to section 300.5 for class 2 wiring anywhere in 725. Does this mean that class 2 wiring going in underground conduit does not need to be rated for wet location? If it does need to be rated for wet location, please point me to the spec.