We are doing an installation for a 4mmBTU/hour fire tube (nartual gas) boiler. The engineer claims we need seal fittings at all of the electrical devices (switches vavles, etc...). I have never seen seal fittings anywhere around industrial boilers. Does anyone know the how the code addresses this? thank-you