j_braddock
Member
i was walking through the plant and ended up helping one of our maintenance workers.
he was tracing some wiring in a control panel and had to remove the cover off some panduit wiring duct. it was packed full. it took both of us to put the cover back on the wiring duct.
i know that there is a 40% fill on conduits and wire troughs, but i do not know what the classification of wiring duct is inside a control panel and the accepted fill capacity.
thank you in advance for your help.
he was tracing some wiring in a control panel and had to remove the cover off some panduit wiring duct. it was packed full. it took both of us to put the cover back on the wiring duct.
i know that there is a 40% fill on conduits and wire troughs, but i do not know what the classification of wiring duct is inside a control panel and the accepted fill capacity.
thank you in advance for your help.