I have been out of the field for some time, so I need a refresher on Classified Area Applications, this is my question
I remember that when making a pentration between divisions such as a CL. 1 Div. 2 to a general-purpose area that a Seal is required with in 18? of the boundary and that the only fitting between the Seal may be a solid fitting (i.e. EL 29) and that a Form 7 conduit body (i.e. LL, LR, LB) would not be to code when installed between the boundary
Hope I have given enough information on this, also if you can direct me to the article Sealing in the NEC were I can review
Thanks
Robert
I remember that when making a pentration between divisions such as a CL. 1 Div. 2 to a general-purpose area that a Seal is required with in 18? of the boundary and that the only fitting between the Seal may be a solid fitting (i.e. EL 29) and that a Form 7 conduit body (i.e. LL, LR, LB) would not be to code when installed between the boundary
Hope I have given enough information on this, also if you can direct me to the article Sealing in the NEC were I can review
Thanks
Robert