JJWalecka
Senior Member
- Location
- New England
I was wondering if anyone knew the measured clearance from a sprinkler head to electrical raceway, cable trays, etc. I have worked at one project and clearance was spec. at 12", another project it was spect. at 18". To code, is the clearance from the center of the sprinkler head and what is the minimum clearance? Thank you.
Justin
Justin