dean4766
Member
- Location
- denver,colorado
I installed a j box in a ceiling and pulled wires And terminated at the panel and the the receptacles, the sprinkler installer installed a line 2” below the opening of my box, I told the the sprinkler guy he had to move his line over because I would not pass code, and in fact I said I needed 6” clearance in front of that box, but when I looked in code I can’t find a code reference to support that and actually what I do find is in table 110.26 a1, which is 3’ for 0-150 volts to ground, which is impractical at times, any of you have any thoughts on this or any experience