Does the code requires workspace clearance for a meter base and HVAC condenser unit disconnects.
I have a cuatomer who just fired their electrician and hired my company to finish/cleanup the mess. What I noticed is that the home was built as a new construction and the 2 AC UNIT outdoors were right in front of the meter base and the disconnects were installed behind them too. I'm at the last stages and before i order wire or try to finish up. Do you think there will be a problem?
Sent from my SM-N920T using Tapatalk
I have a cuatomer who just fired their electrician and hired my company to finish/cleanup the mess. What I noticed is that the home was built as a new construction and the 2 AC UNIT outdoors were right in front of the meter base and the disconnects were installed behind them too. I'm at the last stages and before i order wire or try to finish up. Do you think there will be a problem?