brady.grant
Member
- Location
- Layton, UT
As shown in model I created. I have a group of panels. These panels have 3ft clearance in front of them. My question is the Housekeeping Pad (step) that is underneath Panel #1 on the Left.
I consider this finished grade as it is permanent. The question is that if this step is a clear space violation.
I appreciate your response.
Note: These panels are low voltage ( 24 volts and under) control panels. They are supplied by a 110 volt 20 amp circuit.
Best Regards


I consider this finished grade as it is permanent. The question is that if this step is a clear space violation.
I appreciate your response.
Note: These panels are low voltage ( 24 volts and under) control panels. They are supplied by a 110 volt 20 amp circuit.
Best Regards