Electron_Sam78
Senior Member
- Location
- Palm Bay, FL
Where in the '08 code does it say that when remodeling or upgrading/modifying an electrical system or equipment that you have to bring the installation up to code?
We had a subcontractor at work install a new lift station control box but didn't install a equipment grounding conductor. It didn't have one to begin with but I believe they should have made the equipment code compliant. This unit is outside and run from a CB panel in a building 50 feet away. The conductors supplying the lift station are technically feeders I guess since there are CBs inside the control box.
Also what is the section that states that there needs to be a ECG? I don't have my code book with me right now so I haven't even tried to find it.
We had a subcontractor at work install a new lift station control box but didn't install a equipment grounding conductor. It didn't have one to begin with but I believe they should have made the equipment code compliant. This unit is outside and run from a CB panel in a building 50 feet away. The conductors supplying the lift station are technically feeders I guess since there are CBs inside the control box.
Also what is the section that states that there needs to be a ECG? I don't have my code book with me right now so I haven't even tried to find it.