I'm from mass, and I have a question on which code cycle do you use.
If I pull an electrical permit in December of 2013 for a bathroom remodel and the rough and final inspections are going to be in 2014, will the inspector follow the 2011-2013 codes or 2014-2016 codes, thanks for your help, mike
If I pull an electrical permit in December of 2013 for a bathroom remodel and the rough and final inspections are going to be in 2014, will the inspector follow the 2011-2013 codes or 2014-2016 codes, thanks for your help, mike