stew
Senior Member
- Location
- federal way,washington
an old zinsco panel 125 amp being fed thru the back from the meter. We remove the dastardly guts put a 1.5 inch nipple 3 inches to the right and hang our new c/h panel. we bond all this properly. We splice all our branch circuits in the old zinsco and use snap ins in both panels where needed and two screw clamps where needed. all these branch circuit conductors leave the old panel and reenter the new. Ok so far? Now we spin the exixsting service conductors which enter the back of the old panel thru the aformentiioned nipple to the new panel and terminate to the breaker. Code violation?
[ February 23, 2006, 11:01 PM: Message edited by: stew ]