Looking for a little direction for a load calculation on a addition to a café, Service is being replaced as it needs to be relocated. I thought there was a restaurant example in the back of the code book but did not find one. Have been reading through section 220 but was wondering if there was a good outline for one like you can find for residential service calculation. It is a single phase building. Thanks