wireperson
Senior Member
- Location
- Florida
I had a call today , it was a laundromat , the meter can was burning and they lost 1 phase from the meter to the main breaker inside the building, I'll be calling the poco tomorrow to open the metercan and see what's cooking in it , my guess is that they are since they using a 200A service the load conected to that service its been slowly melting the meter socket and I believe that a service upgrade to 400A is needed.the question is how do you do a load calculation for a laundromat.I found an all thread about this , but I'd like to hear more opinions.