cyndarik1967
New User
- Location
- vernon
- Occupation
- electrician
i have a job that is an older home that had a solar system installed, the electrical is in cold sequence. the riser is outside the two hundred amps disconnect is inside,
the ser 4/0 cable goes to a two non bye pass meter then from there feeds two main breaker panels.is there a concern to back feed the other panel if it is being worked on if the service disconnect for the solar is not turned off
the ser 4/0 cable goes to a two non bye pass meter then from there feeds two main breaker panels.is there a concern to back feed the other panel if it is being worked on if the service disconnect for the solar is not turned off