I’m currently bidding a remodel. Probably 200 lights altogether. Existing drop ceiling is coming down and new drop ceiling goes in it’s place. I can’t get access to the building. I know that there is lighting and raceway there but have no idea what the layout circuits are. At minimum I’d probably have to pull out the wire and start over. But no idea how much conduit needs to be reworked.
In this situation do you bid a percentage as rework, 25% or 50%, or do you just bid it as all new conduit or wire?
Or write up what you can see and exclude any rework necessary and that’s extra?
Thanks
In this situation do you bid a percentage as rework, 25% or 50%, or do you just bid it as all new conduit or wire?
Or write up what you can see and exclude any rework necessary and that’s extra?
Thanks