Engineer used NEC 2017 Article 220.54 demand factors in commericial laundromat sub panel demand load calculation. Sub panel is 208/120V three lhase.
NEC 2017 Article 220.54 is for dwelling units. I don’t see anywhere else it can be used for commericial laundromat.
Am I correct or incorrect NEC 2017 Article 220.54 doesn’t apply to commericial laundromat? If it doesn’t apply then which section in NEC 2017 Article 220 applies to commericial laundromat?