Good day! We've been tasked to develop a commissioning test plan for an electrical facility of new constructed buildings. Does someone here could provide me samples e.g. test forms for a pre-functional test of the following equipment?

* Medium voltage cable
* Pad Mounted Transformers
* Medium Voltage switchgears
* Low voltage switchgears
* Generator Synchronizing panel
* Low voltage cable
* Busway/busduct
* Automatic transfer switch/Manual TS
* First Private Pole (Outdoor loadbreak switch, switch disconnect, CT/PT, Sectionalizer)

I don't want to miss anything. If you have any other guides aside from what I'm using (NETA ATS), your suggestion is appreciated.

Thanks a lot :bye::bye::bye::bye:
 