We have a project in California that is a roof top installation with the inverters connected line-side in accordance with NEC 705.12 (A).
We have a SolarEdge Commercial Gateway / Data Logger, with a set of environmental sensors the sensor wires are limited by length and shorter is better as they are sending a voltage or current to the gateway and not a digital signal. The question I have is it ok to tap the solar photovoltaic line say a phase to neutral with an inline breaker feeding the gateway as it is part of the photovoltaic systems communication equipment?
We have a SolarEdge Commercial Gateway / Data Logger, with a set of environmental sensors the sensor wires are limited by length and shorter is better as they are sending a voltage or current to the gateway and not a digital signal. The question I have is it ok to tap the solar photovoltaic line say a phase to neutral with an inline breaker feeding the gateway as it is part of the photovoltaic systems communication equipment?