Anyone can help me with this?
How do we request Con Edison for incoming service with a demand load of 13,000 amp building.? 4 @ 4000 amp or what? 3@ 4000 amp is a little bit too less.
Not sure how 12,000 amps will work for a 13,000 amp load. How was the 13,000 amps calculated?