Code states that all electrodes that are present need to be bonded together to form the GE system. With that being said, is there actual wording in the code that REQUIRES this to be installed at the time the footing is being installed whether it be building or electrical code? If one is not present at the time the EC shows up at the job can it simply be dismissed and alternate forms(driven rod, etc) be installed to meet code requirements? I realize that contractors who work with the same subs will probably have this issue down pat, but what about the EC's who get the job after the foundation work is completed and it's not available. Has anyone had an AHJ insist that the foundation be excavated and this installed after the fact? Thanks,