Daniel Geenen
New member
I'm working on a service with the main disconnect located outside the building and feeding to a 1600 amp switchboard inside the building. The swithcboard then feeds to a remote located 200 amp panelboard. I am putting in a concrete encased grounding grid to support the ground rods. The office complex has many computor loads and I have surge suppression at the MDP and want the best ground available. Should I tie the remote panelboard into the concrete encased grounding grid along with the MDP, Service disconnect, is it required?