Hi, I am working on a large single family dwelling and need to connect some of the Mechanical rooms with Rigid Non Metallic Conduit (PVC). Right now the walls are up and there is small (1" to 2") gravel as the floor. I was wondering what the standard practice is for running PVC inside and under a building. Do i need to lay sand around the conduit or is it ok to have it just on the gravel? they will be adding more gravel above the conduit and compacting the gravel prior to the pour.
Thanks in advanced.