Re: Concrete encased rebar for GEC in 2005
2005 - According to 250.52, all the listed electrodes are required if present. I don't see were any one of the seven are described as the "main".
The fact that the water pipe needs an supplemental electrode doesn't imply that it is the main. In fact, it means that it is less reliable. The supplemental requirement is there so that when the municipal changes the metal water pipe to a plastic one(no "if", only a matter of time), with the supplemental electrode already in place, thanks to this requirement, the system is still grounded.