:?:? At an auto repair shop where I go, they were told that their 650 amp 3 phase service underground service was required to be encased in concrete because of the danger of explosion & the concrete encasementcontaining it.
Concrete was put in the ditch, then 3" rigid metal conduit, & concrete on top. The risers on the pole & to the disconecting means are PVC.
DOES the NEC require this? Is is your standard repair shop.
Thanks,