jerrydk
Member
- Location
- san bernardino,ca.92410
what is the code on concrete floor trench(duct) with floor covers ,to run feeder cables from main panel to equipment. 1200amp sub breaker in main to 1200amp breaker in equipment, run is about 200'.
first time to try this, hope I did it right? jerrydk
first time to try this, hope I did it right? jerrydk