Old school mentality seems to have been that in a commercial service to trough out both top and bottom of all panels to give you the most convenient route of getting line and load in and out of panels. With new code requirements doesnt this run into conductor deration issues for example running 3 section panels all with separate neutrals creating 240 current carrying conductors leaving the trough out to respective loads in a 10X10 in trough?