First time poster here, but have a question on how some of you take-off your branch circuits. For instance, can you have 3 separate circuits fairly close together, would you assume grouping 9 conductors + ground in 1 3/4" conduit? Than once you hit one, drop down to 6 conductors + ground, and so on...? I tend to be a perfectionist on things like this, but it takes 10x as long, especially when your dealing with a 3 million + project.
So my question being, is a quicker way to just assume 10 wires the whole way, or to assume a new conduit per homerun? The same works for supports, should i assume strut racks, and just get a rough count at the end?
Any help is appreciated, Thanks!:angel:
First time poster here, but have a question on how some of you take-off your branch circuits. For instance, can you have 3 separate circuits fairly close together, would you assume grouping 9 conductors + ground in 1 3/4" conduit? Than once you hit one, drop down to 6 conductors + ground, and so on...? I tend to be a perfectionist on things like this, but it takes 10x as long, especially when your dealing with a 3 million + project.
So my question being, is a quicker way to just assume 10 wires the whole way, or to assume a new conduit per homerun? The same works for supports, should i assume strut racks, and just get a rough count at the end?
Any help is appreciated, Thanks!:angel: