Does the NEC require conduit, or outdoor wire, on a lighting circuit in a lean to. The application is a lean-to off a metal building that is open on three sides. The wire would be ran down the rafter under the roof.
 
Re: Conductor in a Lean-TO

As long as you don't expect the wiring method to be exposed to excessive dampness or moisture, a wiring method for a normally dry location should be fine. Check with your AHJ.
 