rmerz01
Member
- Location
- Toms River, NJ
- Occupation
- Project Manager
Engineer is saying we owe link-seals on our conduit penetrations through the foundation. It's all underground. Dirt on both sides. As far as I'm aware, link-seals are used when you penetrate into dry space. It makes no sense to use it from dirt to dirt. Anyone have experience here?