Initially, I ran 8#12, 1#12G in a 1-1/2" Conduit from an existing Panel to a power pull box. From the pull box, i then ran 2#12, 1#12G along with 8#14 to one of the metering panel. From the metering panel, i power one of the pump with 2#12, 1#12G and 4#14 (for high pressure, fail). Also from the metering panel, i powered the Motor operated valve with 2#12, 1#12G, and 4#14.
After thinking about it, instead of running the 8#12, 1#12G from the existing panel to the power pull box, I decided to run it to a new 6 circuit panel which will allow me some room to work with for future expansion. So now i can reroute all of the power conduit to this new 6 circuit panel. But from this 6 circuit panel, can i still keep the control wires along with the power wires when i run the 6 ckt panel to the metering panel? Before, the 2#12, 1#12G and 8#14 was coming from the power pull box to the metering panel. Now can I keep the same thing by running it from the 6 ckt panel to the metering panel?