Wondering where in the code it states that roof penetrations for low voltage HVAC control wiring need to be ran in rigid conduit? Roof
deck is 6 inches of concrete on one building and steel deck/membrane on the other. If properly supported why are EMT and raintight
fittings unacceptable. Can't find it in the NEC/ICBO.