Conduit Routing

Status
Not open for further replies.

mstrlucky74

Senior Member
Location
NJ
Wiring from 200a switch to LP panel but need to hit meter in between. 200A switch and LP panel are 10’ away from each other but meter is 30’. Doesn’t make sense that you have to pipe from switch to meter than from meter to LP panel. But according to the attached that’s what would have to be done unless meter was relocated, correct? Thanks.
 

Attachments

  • Capture.jpg
    Capture.jpg
    9.3 KB · Views: 1
  • Capture 2.jpg
    Capture 2.jpg
    6.6 KB · Views: 1

infinity

Moderator
Staff member
Location
New Jersey
Occupation
Journeyman Electrician
That's the way it's drawn so it's either request to change the layout or install as drawn.
 