mikeybmdb32
Member
When a conduit stubs up through a concrete slab and terminates at a panel 2.5 feet above the slab, does the conduit need to be supported near the panel? I know the rule is support within 3', but the installation looks flimsy without support near the panel. Does the slab count as support within 3'?
Last edited: