How do I estimation the length of the conduits & No of condulets from the shop drawing.
The shop drawing just mentions the conduits which drops from the tray till the final load. I just measure the length of the conduit in the Autocad. How to accurately estimate the no of condulets required?
How do you estimate?
The shop drawing just mentions the conduits which drops from the tray till the final load. I just measure the length of the conduit in the Autocad. How to accurately estimate the no of condulets required?
How do you estimate?