I am having a mobile home with 100amp panel delivered for temp housing during a home renovation project - it will be connected to my main house panel using mobile home feeder cable. I have two options - I have a main panel in the basement and I have a 100amp sub panel that I installed for my pool on the outside wall of the house. The goal is to install 100 amp breaker on my main panel and run the MHF cable, use some anti-ox paste, install a cable clamp on the panel and call it a day. I have an electrical background and have done some significant work on my house (legally which has all been underwritten), but this is a unique situation. Is there anything I am missing? The election on my job should be around a few days later but I was hoping to get it powered up before then.