I am Arvin Villavicencio of CIP II Power Corporation, a generation and distribution company in a small industrial park here in the Philippines.
I decided to write and inquire here.
Currently, we have a power plant with 4 generator sets (2x3.5MW and 2x7MW) totalling 21MW capacity. We are also in island mode right now. We generate voltage of 13.8kV, distribute it through a substation, and goes to locators and eventually step-down the voltage to whatever requirement of the customer.
We are also currently discussing to be connected to an outside power provider, specifically a local utlility provider. I just want to inquire if this is possible and are there any implications in doing this? If possible, can I request for a detailed process?
Would appreciate if you could help me on this one.
I decided to write and inquire here.
Currently, we have a power plant with 4 generator sets (2x3.5MW and 2x7MW) totalling 21MW capacity. We are also in island mode right now. We generate voltage of 13.8kV, distribute it through a substation, and goes to locators and eventually step-down the voltage to whatever requirement of the customer.
We are also currently discussing to be connected to an outside power provider, specifically a local utlility provider. I just want to inquire if this is possible and are there any implications in doing this? If possible, can I request for a detailed process?
Would appreciate if you could help me on this one.