What is more effective?... ground rods buried vertical 8' down or ground rods buried horizontal. I am installing new underground service (200 amps), the conduit is 2 1/2 HDPE, Wave-Rib, flexible schedule 40 (red)...and because by mistake, the digger made a trench of 5'+ I would like to take the advantage and position the rods vertically along the trench....also we will use "part of the trench" for a PVC gas line (yellow) Any sugestions? Louis Duke