Hi, New construction, planning for future light controls, automation. The thought was to wire the house as normal per code and then add a 600v rated control cable 4 conductor feeding into each 14/2 switch box. The other ends of these control cables terminate in a junction box in the dedicated service room.
I know I will probably get a buch of :lol: for this but it's just one approach.
One of the control lines will need to be ground and run back to the metal junction box. The ground might need to equal 14/2.
I'm not sure if the control wire size would need to equal the 14/2.
I would guess the other 3 control lines would be wire nutted together.
H'mm what else, wire specs to equal or exceed NM. Maybe routing seperate from NM.
What will the AJ think. Thought I might ask here first because you guys know everything.
I know I will probably get a buch of :lol: for this but it's just one approach.
One of the control lines will need to be ground and run back to the metal junction box. The ground might need to equal 14/2.
I'm not sure if the control wire size would need to equal the 14/2.
I would guess the other 3 control lines would be wire nutted together.
H'mm what else, wire specs to equal or exceed NM. Maybe routing seperate from NM.
What will the AJ think. Thought I might ask here first because you guys know everything.